Categories
White jacket with openwork patterns
Crochet, Knitting ideas, Coats, cardigans, jackets

White jacket with openwork patterns

knitted jacket

White jacket with openwork patterns

Jacket size: 38/40.

pattern

The jacket is crocheted.

You will need: about 550 g of “Alpha” yarn from ONline white color Fb 01 (100 % cotton, 104 m/50 g), hook no. 3.5.

Pattern A: The number of loops is a multiple of 16 + 3 + 3 air. lifting point. Knit according to pattern 1. Start each row with 3 air. p. instead of 1st tbsp. s/n. Start with loops before rapport, repeat repeat loops, end with loops after repeat. Knit 1 time from the 1st to the 9th r., then repeat from the 2nd to the 9th r.

crochet pattern

Pattern B: The number of loops is a multiple of 8 + 3 + 3 air. lifting point. Knit as pattern A, only according to pattern 2. Knit 1 time from the 1st to the 3rd r., then repeat the 2nd + 3rd r.

crochet pattern

Pattern C: The number of loops is a multiple of 28 + 15 + 1 air. lifting point. Knit according to pattern 3. Start each row with 1 air. p. instead of 1st tbsp. b/n. Start with loops before rapport, repeat repeat loops, end with loops to arrow A. Knit 1 time from 1st to 11th row, then repeat from 6th to 11th row.

crochet pattern

Sequence of alternating patterns 1: 17 rub. pattern A, 9 r. pattern B, 22 r. pattern C.

Sequence of alternating patterns 2: 25 rub. pattern A, 9 r. pattern B.

Knitting density on average: 20.5 dial-on stitches and 9 r. = 10 x 10 cm.

Back: Knit a chain of 99 air. p. and 3 p. air. p. rise and continue knitting in the sequence of alternating patterns 1. After 54 cm from the set of loops, finish the work.

Left shelf: Knit a chain of 51 air. p. and 3 p. air. p. rise and continue knitting in the sequence of alternating patterns 1, while finishing pattern C with loops to arrow B. To cut the neckline, 39 cm from the set of loops from the left working edge, leave unknitted in each row. 1 x 3, 2 x 2 and 2 x 1 cm. Finish work on the remaining loops at the height of the back.

Right shelf knit symmetrically.

Sleeves: Knit a chain of 67 air. p. and 3 p. air. p. lifting, continue knitting in the sequence of alternating patterns 2. At the same time, to bevel the sleeves from the set of loops on both sides, evenly add 1 p. 8 times alternately in every 2nd and 4th r. and 4 times in every 2nd r. = 91 p. After 38 cm from the set of loops, finish the work.

Assembling the jacket parts: Sew shoulder seams. Sew in sleeves and sew side and sleeve seams. Tie all edges with 1 circle. R. shells (= * 1 tbsp, skip 1 cm, 6 tbsp in 1 base stitch, skip 1 cm, repeat from *).

Related posts

Leave a Reply

Required fields are marked *

en_USEnglish