Categories
Day to Date jumper.
Crochet, Knitting ideas, Sweaters, pullovers, jumpers

Day to Date jumper.

knitted pullover

Day to Date jumper.

DIMENSIONS:
S – M – L – XL – XXL – XXXL

pattern

MATERIALS:
DROPS MERINO EXTRA FINE from Garnstudio (belongs to yarn group B)
700-750-800-900 -1000-1100 g color 37, foggy forest

KNITTING DENSITY:
16 triples wide x 5.5 rows high = 10 x 10 cm.

HOOK 4.5 MM.

The jumper is knitted in the round, from top to bottom. First, the yoke is processed, then divided into body and sleeves, which continue separately in a circle.

knitted pullover

START
Chain 88-88-96-100-100-108 with 4.5mm crochet and Merino Extra Fine and form into a ring with 1 slip stitch in the first chain stitch. Work 1 double crochet in each stitch to end of row - 88-88-96-100-100-108 double crochets.

WORKING MATERIALS A.1 – A.9 AS FOLLOWING:
Insert 4 marker threads (allowing them to follow your work) at the same time as you work in the round as follows:
*Insert marker thread, work A.1 over 1st stitch, A.2 over 1st stitch and A.3 over 1st stitch (= sleeve), marker thread, work A.4 over 2-2-4-2-2-4 loops, A.5a through 17-17-17-18-18-18 loops, A.6 through 1-1-1-3-3-3 loops, A.7 through 1 loop (= middle loop), A. 8 through 1-1-1-3-3-3 sts, A.9a through 17-17-17-18-18-18 sts and A.4 through 2-2-4-2-2-4 sts (= front / back) *, repeat from * – * 1 more time.

crochet pattern
crochet pattern
crochet pattern

Continue this pattern, but only work A.2 up to the needle in your size, then work these stitches in A.4. Once A.5a and A.9a are completed, work on A.5b and A.9b, and then repeat these patterns further in height.

REMEMBER THE DENSITY OF KNITTING!
Continue until A.1, A.3, A.6, A.7 and A.8 are completed in height.
There are 29-31-39-37-33-31 stitches on each sleeve, 75-75-79-81-81-85 stitches on the front and back.
The product measures approx. 14 cm, measured at the shoulder.

REPEAT FIGURES A.1 – A.9 AS FOLLOWING:
First round works as follows: * A.1 over first stitch, A.4 over 27-29-37-35-31-29 stitches and A.3 over 1 stitch (= sleeve), work A.4 over 2-2 -4-2-2-4 loops, A.5b through 17-17-17-18-18-18 loops as before, A.4 through 17 loops, A.6 through 1-1-1-3-3 -3 loops, A.7 through 1 loop (= middle stitch), A.8 through 1-1-1-3-3-3 loops, A. 4 over 17 loops, A.9b through 17-17-17- 18-18-18 sts as before and A.4 through 2-2-4-2-2-4 sts (= front/back) *, repeat from * – * 1 more time.
Continue this pattern until the piece measures approx. 22-24-25-27-29-31 cm from the cast-on edge, measured along the shoulder (i.e. approximately 7-9-10-12-14-15 rounds after the first repetition of A.1 - A.9). NOTE: Each time A.6/A.8 ends in height, repeat A.6/A.8 in height on each side of A.7; the remaining stitches above A.6/A.8 are connected to A.4.
There are now 45-51-59-61-61-63 stitches on each sleeve and approx. 95-101-107-115-119-127 stitches on front and back = approx. total. 280-304-332-352-360-380 loops.
Now divide the part into body and sleeves as follows:
Work 6-6-6-8-10-12 chain stitches, skip sleeve stitches (= approx. 45-51-59-61-61-63 stitches), knit stitches as before (= approx. 95 -101- 107-115-119-127 stitches), work 6-6-6-8-10-12 chain stitches, skip sleeve stitches (= approximately 45-51-59-61-61-63 stitches) and work back of stitch, as before (= approx. 95-101-107-115-119-127 stitches).
It's ok now. 202-214-226-246-258-278 sts in the round (= approx. 101-107-113-123-129-139 sts front and back).

knitted pullover


:
FRONT AND BACK
Work 1 pattern round as before and 1 double crochet/treble crochet (to fit into the pattern) in each chain stitch under the sleeve. Cut the strand and move the beginning of the rounding to the middle under one sleeve. Insert 1 center marker under both sleeves.

crochet pattern


Then work the pattern as before, but reduce the number of stitches on both sides as follows: * Work A.4 through 2-2-4-4-5-8 stitches, A.10a or A.10b (select the circle in the pattern, so that it matches and continue the pattern from the yoke) another 11 loops, knit the pattern as before; those. continue increasing on each side A.7 (as shown in charts A.6 and A.8) until there are 13-13-15-15-16-19 stitches left before side marker, work A. 11a or A.11b ( select a round on the diagram that matches and continues the pattern from the yoke) *, work with * – * 1 more time.
Continue this pattern; those. on each round of double treble crochets, increase the number of stitches on each side of A.7 as shown in patterns A.6 and A.8 (= 8 double treble crochets increased per round) and decrease stitches in A.10 and A.11. (= 4 double crochets decreased in circle).
Once A.10 and A.11 are completed in height, reduce 2 stitches on each side of the piece (= 4 stitches total on each round) to final length - read REDUCE TIP-1. Work until the product reaches approx. 25-25-26-26-26-26 cm from the division, measure along the side at the shortest point - set the value after the row of single crochets (approx. 11 rows of single crochets = 11 increases).
Now work the edge as follows:
Work * 1 single crochet, 3 chain stitches, skip 1 cm *, work from * – * to end of row, adjust to finish with 3 double crochet and 1 slip stitch in first double crochet.
Make sure the edge is loose; Skip fewer stitches if necessary. Trim and secure all strands. Jumper length approx. 50-52-54-56-58-60 cm, measured from the shoulder down at the shortest point.

knitted pullover

SLEEVE:
Secure a strand with 1 slip stitch in the third chain stitch under the sleeve, work 1 single crochet/triple crochet in each of the 2-2-2-3-4-5 chain stitches under the sleeve (regardless of whether you work in stitches double crochet or double triple crochet depending on where you are in the pattern), work 1 double crochet/triple crochet in each of approx. 45-51-59-61-61-63 stitches for sleeve skipped and finish with 1 single crochet/triple crochet in each of last 3-3-3-4-5-6 chain stitches under sleeve = approx. 51-57-65-69-71-75 double crochet / tees double crochet.
Continue the round as per A.4.
When the sleeve length reaches 2 cm, reduce the sleeve length by 2 loops - read REDUCE TIP.
Decrease in this way every 5-3-2½-2½-2½-2 cm for a total of 8-11-13-13-14-15 times = approx. 35-35-39-43-43-45 stitches.
Continue pattern until piece measures 43-42-41-40-38-37cm (or desired length - NOTE: shorter measurements in larger sizes due to wider neck and longer yoke) - adjust after a row of double crochets.
Now work the edge of the sleeve as follows: work * 1 single crochet, 3 chain stitches, skip 1 cm *, work from * – * across the entire sleeve, adjust to finish with 3 chain stitches and 1 slip stitch in the first. double crochet. Cut and secure the strand. Process the second sleeve in the same way.

NECK CUT.
Work the edge around the neck as follows: start from the middle of the shoulder and secure the strand by making 1 slip stitch per 1 stitch, work * 1 single crochet in the next stitch, 3 chain stitches, skip 1 cm *, knit from * – * until the end of the round ; adjust so that you end with 3 chain stitches and 1 slip stitch in the first double crochet. Make sure the edge is loose; Skip fewer stitches if necessary. Cut and secure the strand


Related posts

Leave a Reply

Required fields are marked *

en_USEnglish